CPC has kept busy during 2016, and several of our crews are working hard and keeping us on schedule for one of our most productive years. Keeping with that trend and momentum, our estimating team is constantly working to find more projects to keep our employees hard at work now, and well into the future.

2016 Projects:

Interstate 5, Anlauf to Elkhead Road, Douglas County, Oregon, 2016

Click Image to View Gallery

Click Image to View Gallery

CPC, along with the Oregon Department of Transportation and other contractors is working to replace 7.4 miles of asphalt road surface of I-5 with concrete between the Elkhead Road interchange (Exit 154) and the Oregon 38 junction (Exit 162) in southwestern Oregon.

This stretch of I-5 was last paved in 1997 and has been repaired multiple times due to normal wear and tear. The new continuously-reinforced concrete surface will be two lanes, totaling 25 feet wide and is designed to last 50 years (35-40 years longer than an asphalt roadway would last). This project is scheduled in multiple phases to have minimum impact on travelers on I-5 and will conclude in summer, 2017. CPC has even upgraded our paver technology to allow for 25′ wide paving with variable cross-slopes, which cuts paving and curing time down by at least half, which will allow for a much earlier completion and return to normal traffic flow in record time.

For more information, check ODOT’s Project Information Page. .

.

Interstate 84 Durkee to Nelson Point, Old Oregon Trail Highway, Baker County, Oregon, 2016

I-84 Durkee to Nelson Point

Click Image to View Gallery

CPC is working with Oregon Mainline Paving, LLC and the Oregon Department of Transportation to replace four miles of Interstate 84 from Durkee to Nelson Point in eastern Oregon.  CPC will install both single-lane and double-lane panels of continuously-reinforced concrete pavement to repair and extend the life of this stretch of interstate roadway, which has been in need of repair for quite some time.

Work on this project will be completed near the end of 2016.

.

.

Big Wood River Bridge, Blaine County, Idaho, 2016

Big Wood River Bridge Replacement

Click Image to View Gallery

Concrete Placing Co., Inc. is in the process of replacing the bridge over the Big Wood River on State Highway 75 just north of St. Luke’s hospital in Blaine County, Idaho.

The three-lane bridge is being widened to four lanes and will ultimately have wider shoulders and a safety median to provide better and safer travel over the Big Wood River. There will also be an improved wildlife passage corridor  under the bridge to minimize encounters between animals and motor vehicles.

More information about this project can be found in this TI News Daily Article and in this ITD Newsletter.

.

State Highway 97 & I-90 Overpass Replacement, Kootenai County, Idaho, 2016

SH-97 I-90 Overpass

Click Image To View Gallery

CPC is in the process of replacing the Interstate 90 Overpass Bridge at State Highway 97 in Kootenai County, Idaho. This will also include work on approaches at the overpass on SH-97.

.

.

.

.